London 2012 Olympic Park | London UK | LDA Design with Hargreaves Associates

LDA-DESIGN-OLYMPIC-PARK-9

The London 2012 Olympic Park is one of the most significant new pieces of urban realm to have been created in living memory. LDA Design  in collaboration with Hargreaves Associates has led the design of the Parklands and Public Realm for the entire 102 hectare site and has masterminded its transformation from contaminated industrial land into a 21st century park. The practice has also led the design of its post- Games transformation into a permanent public park. Forming the centre piece of the London 2012 Olympic and Paralympic Games, the 2.5km2 Olympic Park is the largest new urban park in the capital since the Victorian era and is a catalyst for regeneration in East London.

Continue reading London 2012 Olympic Park | London UK | LDA Design with Hargreaves Associates

2012 London Olympics | Legacy

2012 London Olympics | Legacy
With the London 2012 Olympic over and the Paralympic Games soon to begin, but it won’t be long the all the teams and fans will be at home and the Olympics Park will be empty. The question always comes up what now for the venues, parks and infrastructure that was built for the Olympics? Well the legacy planning has been in the works with the Mayor setting up the London Legacy Development Corporation that will be “setting and maintaining standards for quality of design, construction and urban planning, to ensure a sustainable and enduring legacy for the Park”.
Continue reading 2012 London Olympics | Legacy

Planting starts at London Olympic Park wetland

Planting Day at London Olympic Park Wetland

TV Gardener Charlie Dimmock helping local children with planting

The first of 4,000 new semi-mature trees are taking root in the London’s Olympic Park with around 100 ash, cherry and hazel trees, grown in Hampshire, already planted. The first of 300,000 wetland plants, grown in Norfolk and Wales for the UK’s largest ever urban river and wetland planting, were laid on the river banks today by Minister for Sport and the Olympics Hugh Robertson, TV Gardener Charlie Dimmock, Olympic Gold medal winner Jonathan Edwards, Olympic Delivery Authority (ODA) Chairman John Armitt and children from the Olympic Park construction crew.

The new reed beds are being created in a large wetland bowl in the north of the Olympic Park, formerly a 100 year old landfill site, where visitors during the Games will be able to relax and watch the action in 2012 on live screens. In legacy the riverside area will be a tranquil space for people and wildlife which will also help protect 5,000 properties in the area from flooding.

Over 30 species of native reeds, rushes, grasses, sedges, wet wildflowers and irises have been grown initially by Salix in its nursery on the Gower peninsular in Wales with around a third grown from cuttings and seeds collected in and around the Olympic Park before construction started in 2008.

You can watch the park turn from brown to green with two new webcams

LDA Design in partnership with Hargreaves Associates was selected to design the Olympic Park parklands in spring 2008 and detailed designs were published in November 2008. They are supported by Sarah Price Landscapes, University of Sheffield, Sutton-Vane Associates and Waterwise SolutionsHilliers Nurseries in Hampshire is supplying over 2000 semi-mature trees for the Olympic Park. Salix was appointed to supply over 300,000 wetland plants for the Olympic Park. The detailed design of the river planting was carried out by Atkins.

Wetland Plants at Salix's Norfolk site

SOURCE: LONDON 2012
IMAGES: LONDON 2012

1 2