Smell buffer urged for condo plan near Stampede

Green group criticizes delay of wetlands protection plan

Calgary Herald reports

Environmentalists are disappointed that another plan for Alberta‘s water resources pushes back to at least 2012 a strategy for protecting wetlands.

“After a decade of debate and the loss of thousands of hectares of wetlands in Alberta, we can no longer afford to delay taking action to protect our wetland resources,” said Danielle Droitsch, executive director of the conservation group Water Matters.

SOURCE: Calgary Herald – Green group criticizes delay of wetlands protection plan

St. Patrick’s Bridge (Calgary) shortlist announced

The Calgary Municipal Land Corporation (CMLC) and its 10 member advisory committee today announced the three design submissions selected to move forward to the next stage of the competition for the new St. Patrick’s Island pedestrian bridge in East Village. The bridge will link St. Patrick’s Island with East Village to the south and the Bow River pathway system to the north. It will provide improved linkages to many different nearby communities including East Village, Inglewood and Bridgeland, and when combined with the improved pedestrian and cyclist connectivity of the Fourth Street Underpass, will play an important role in improving sustainable transportation and recreational linkages throughout the east end of downtown and the Beltline.

The call for preliminary concepts attracted international attention. The finalists were chosen from 33 submissions received from around the world, and displayed a wide variety of ideas and concepts for consideration. The finalists are:

• Submission #7 by Buckland and Taylor Ltd. (Vancouver) and Kitchell – Architecture + Design (Victoria, BC)
• Submission #15 by ARUP with Falco Schmitt Architects (London, UK)
• Submission #29 by RFR (Paris, France) and Halsall (Calgary).

The advisory committee is comprised of community residents from East Village, Inglewood and Bridgeland, Calgary business leaders, architects, engineers and CMLC management. The group found the six-week process of determining a shortlist for CMLC’s Board of Directors quite engaging and challenging. Over 2000, public comments solicited through a website blog and three open house events, played an important role in informing the committee’s recommendation.

The next step in the selection process requires each team to advance its concept to the next level by January 29, 2010.

Reblog this post [with Zemanta]

New Bridge Design competition for Calgary

The Calgary Municipal Land Corporation(CMLC) has announced a bridge design competition for St.Patrick’s Bridge.

CMLC has been charged with the responsibility of implementing public infrastructure improvements that will be the catalyst for private and public sector development in the Rivers District with a focus on East Village. The design and construction of a pedestrian/bicycle bridge – St. Patrick’s Bridge – is an important component of the infrastructure improvements in the Rivers District. CMLC has initiated a competitive process for the conceptual design of the pedestrian/bicycle bridge which crosses the Bow River and provides crucial links between the communities on the north and south of its banks with city attractions, amenities and pathway systems.

CMLC is committed to ensuring that the revitalization of the Rivers District provides the city, the province and the country with an excellent asset for Calgary to remain among the best places in the world to live, work, play and visit.

Closing: Sept 14, 2009

For more information go to the competition website.

WORLD LANDSCAPE ARCHITECT is not involved in this competition please send any enquiries or requests for information to the organisations via the competition website..

Calgary’s Calatrava footbridge unveiled

Calgary Herald reports

CALGARY – The newly released design for the city’s new pedestrian bridge has been derided by some Calgarians as a gaudy red waste of $24.5 million, and praised by others as a sleek, elegant contribution to downtown Calgary.

But to the architect, Santiago Calatrava, the Bow span is the most accessible, functional and technically challenging one he’s ever made…

read the full story at the SOURCE: Calgary Herald – Calgary’s $24.5M footbridge unveiled to cheers, jeers

IMAGE SOURCE: City of Calgary
IMAGE CREDIT: Santiago Calatrava

1 2

FEATURE PROJECTS

PROFILES

BOOK REVIEWS