Madrid’s Shell Bridge gets its concrete dome – West 8

Construction is moving along at the first Shell Bridge, West 8+ MRIO designed for the City of Madrid. 100 m3 of concrete was poured inbetween the two layers of the wooden mold, moving another step closer to the desired end result: a concrete dome.

Concept

2118


2238


2237

SOURCE: WEST 8
IMAGE CREDIT: WEST 8


Warning: array_filter() expects parameter 1 to be array, string given in /home/worldla/worldlandscapearchitect.com/wp-content/plugins/woocommerce-memberships/includes/frontend/class-wc-memberships-posts-restrictions.php on line 925

Warning: array_unique() expects parameter 1 to be array, null given in /home/worldla/worldlandscapearchitect.com/wp-content/plugins/woocommerce-memberships/includes/frontend/class-wc-memberships-posts-restrictions.php on line 1013