Construction is moving along at the first Shell Bridge, West 8+ MRIO designed for the City of Madrid. 100 m3 of concrete was poured inbetween the two layers of the wooden mold, moving another step closer to the desired end result: a concrete dome.
SOURCE: WEST 8 IMAGE CREDIT: WEST 8
ADD YOUR JOB LISTING
SUBSCRIBE TO WEEKLY NEWSLETTER SUBSCRIBE DAILY UPDATES
FOLLOW US ON TWITTER BECOME A FAN ON FACEBOOK JOIN US ON LINKEDIN
ABOUT ADVERTISE
DISCLAIMER PRIVACY POLICY