Singapore opens large floating wetland

Senkang Floating Wetland

Prime Minister Lee at the opening of Senkang Floating Wetland


Over the weekend in Singapore the Senkang Floating Wetland – the largest man-made floating wetland in Singapore was opened to the public by Prime Minister Lee. Developed as part of PUB’s Active, Beautiful, Clean Waters programme, the wetland sitting on the Punggol Reservoir is roughly the size of half a football field.

The wetland links the Anchorvale Community Club to the Sengkang Riverside Park via a bridge on one side, and a boardwalk skimming the water surface on the other, so residents can now enjoy facilities on both banks of the Punggol Reservoir, as well as on the Sengkang Floating Wetland and its boardwalk overlooking the reservoir.

“The wetland is home to about 18 plant species that have been carefully chosen for both their cleansing and aesthetic properties. These plants absorb nutrients and pollutants through their roots. This helps to ensure that the water in this reservoir, an important source of our water supply, stays clean the natural way,” said Mr Tan Nguan Sen, PUB’s Catchment and Waterways Director.

Senkang Floating Wetland

Prime Minister Lee at the opening of Senkang Floating Wetland

SOURCE: PUB

IMAGE SOURCE: PUB

IALE: Future Landscape Ecology

future_ecology_ialeuk
The International Association for Landscape Ecology (UK) held its annual conference at the University of Brighton, 14-16 September. This year’s focus was ‘Future Landscape Ecology’ with sessions on Species responses to landscapes; assessing vulnerability and resilience; future scenarios; problem-solving; workshop sessions; landscape-scale adaptation and management.

Richard Smithers,  ialeUK chair stated

The challenge for future landscape ecology is to help create a new narrative for conserving the natural environment, establishing it as the basis for all useful function.

If future landscape ecology can help provide governments with better information on ecosystem services, then common tragedy might be averted through imposing solutions.

The 2011 conference will be held on 5-8 September(provisional dates) at University of Wolverhampton.

future_ecology_ialeuk
future_ecology_ialeuk

SOURCE: International Association for Landscape Ecology (UK)

IMAGE SOURCE: International Association for Landscape Ecology (UK)

MVVA wins Gateway Arch Competition

MVVA TEAM Site Plan

MVVA TEAM Site Plan

The multi-disciplinary team lead by Michael Van Valkenburgh Associates have been selected over the other 4 teams to proceed to the planning stage of the competition. The jury chose the MVVA Team over four others competing to enliven the area around the Gateway Arch and connect it to downtown St. Louis, the Mississippi River and the Illinois bank. Based in New York, MVVA’s portfolio includes the redesign of Pennsylvania Avenue at the White House, the design of Brooklyn Bridge Park and many other prominent projects.

The MVVA Team’s design concept narrative describes their vision for the redesigned park as a “centerpiece of civic culture, an engine of regional economic growth, a showcase for sustainable ecological restoration and a celebration of the national significance of this historic place.”

MVVA TEAM - Historic Landscape Pond

MVVA TEAM – Historic Landscape Pond

The sponsoring group, the MVVA Team and others will host intensive reviews and workshops this fall to analyze the design concept and conduct a more detailed design exploration. At a minimum, the study will focus on the review of the technical advisory group, the impact on related downtown park properties and the Illinois side of the river, traffic and transportation and federal compliance issues.

For the next stage the MVVA tean will work over a 90-day period, in partnership with the sponsors, the City of St. Louis, the National Park Service and others to further define program requirements; begin developing a design that takes into account the feasibility and practicality of proposed solutions; create a construction budget and fundraising plan; and define the delivery expectations from now until 2015.  The sponsors also will study issues relating to cost and construction, traffic, financial resources and federal compliance.

The project will be constructed by Oct. 28, 2015, the 50th anniversary of the completion of the Arch.

For those of you in St.Louis the leaders of the MVVA team will be introduced, along with details on the next stages of the process, at 10:00 a.m., Friday, Sept. 24, 2010, at the Old Courthouse in downtown St. Louis.

SOURCE: The City+The Arch+The River 2015 International Design Competition

For Full MVVA team list

Continue reading MVVA wins Gateway Arch Competition

Vail Wildlife Crossing Infrastructure Design Competition finalists announced

Recently the finalists for the ARC International Wildlife Crossing Infrastructure Design Competition were selected to continue into Phase 2 of the competition to develop conceptual designs and 3-D models for a wildlife overpass at West Vail Pass along Interstate Highway 70 near Vail, Colorado. The designs are intended to usher in a new generation of wildlife crossing infrastructure using new methods, new materials, and new thinking to reduce structural costs and increase adaptability and ecological function. The five finalist teams are:

  • Balmori Associates (New York) with StudioMDA, Knippers Helbig Inc., David Skelly, CITA, Bluegreen, John A. Martin & Associates, and David Langdon.
  • The Olin Studio (Philadelphia) with Explorations Architecture (Paris), Buro Haphold (London) and Applied Ecological Services.
  • Janet Rosenberg & Associates (Toronto) with Blackwell Bowick Partnership, Dougan & Associates, and Ecokare International.
  • Michael Van Valkenburgh & Associates with HNTB Engineering with Applied Ecological Services, Inc.
  • Zwarts & Jantsma Architects (Amsterdam) with OKRA Landscape Architects, IV-infra and Planecologie

SOURCE: [ARC Competition]

NYC opens first sections of Brooklyn Bridge Park’s Greenway

Brooklyn Bridge Park Greenway

Five additional acres of Brooklyn Bridge Park have been opened to the public, including the first 2,000 feet of the park’s greenway, a 30-foot wide, scenic bikeway and walkway along the East River shoreline. The first section of the new greenway starts at the park entrance at Old Fulton Street and ends at the foot of Pier 2, approximately 2,000 feet to the south.

When complete, Brooklyn Bridge Park will be a sustainably built and operated 85-acre park stretching 1.3 miles along Brooklyn’s East River edge and will include lawns, active recreation fields and courts, a calm water boating basin for non-motorized craft, restored ecological habitats, playgrounds, and a shared bikeway and walkway.  Pier 1 opened to the public in March 2010 and Pier 6 opened in June 2010.

Designed by Michael Van Valkenburgh Associates, Inc, the park has won several important awards including the National Park Service’s 2010 Honor Award for Master Plans.

SOURCE: NYC & Brooklyn Bridge Park NYC

IMAGE SOURCE: Brooklyn Bridge Park NYC

1 ... 14 15 16 17 18 19 20 21 22 23 24 ... 68